Sunday, April 3, 2011

Wow! This is alot of work...

 We marked out the utility room and laundry area!
 The rest of the utility room..gotta have lots of space for the well pump, hot water heater, heated floor manifold, and maybe even a furnace!!
 Here's the closet and walkway to the bathroom from the bedroom on the left.
 Jason has the hang of the excavator..digging is going pretty fast! Thank goodness for equipment! By hand we would have been at this for weeks!
 Here is our kitchen..the left ditch is one row of cabinets..the right is the other..the line down the middle is the drain for the kitchen sink!
 Holy Cow..there's an excavator in my bedroom!

No comments:

Post a Comment